YEAR ONE / PRACTICE FRAMEWORK
Use the framework to locate the pressure, make the next decision and move forward.
<aside> <img src="1" alt="1" width="40px" />
Work out whether the move is financially viable.
</aside>
<aside> <img src="2" alt="2" width="40px" />
Build a visible, active pipeline before work becomes urgent.
</aside>
<aside> <img src="3" alt="3" width="40px" />
Price projects properly and control scope from the start.
</aside>
<aside> <img src="4" alt="4" width="40px" />
Run projects smoothly, protect time and cash flow.
</aside>
<aside> <img src="5" alt="5" width="40px" />
Maintain momentum, reduce risk and keep the practice healthy.
</aside>